Meet us at AWEA Offshore WINDPOWER 2019

October 23, 2019

Meet us at AWEA Offshore WINDPOWER 2019

October 23, 2019

Wiring for Success: How Digitalization Can Reduce Risks and Lower Costs?

Digitization delivering efficiency, transparency and feeding the US offshore wind industry’s own “learning curve”. With appropriate instrumentation and communication infrastructures – “big data” will soon make it possible for US offshore wind developers to virtually build-out and operate their commercial lease areas, simulating all construction phases plus a 25-year operational life BEFORE finalizing their Construction and Operation Plan, to inform critical design decisions such as turbine and foundation selection, turbine placement, and hub height.

Tampnet’s Chief Digitalization Officer, Frode Støldal will be part of a panel together with Peter Jenkins, CEO 4Subsea, and George Hagerman, Senior Project Scientist Old Dominion University, Center for Coastal Physical Oceanography.

Room: Avenue 34 – Studio 1&2 Wednesday, October 23, 2019: 11:15 AM – 12:15 PM

Frode Støldal, CDO Tampnet.

Read more about AWEA 2019 here.